On June 6, PetroChina New Oil (Hutubi) New Energy Co., Ltd.Hutubi 1.65 million kilowatt market-based grid-connected photovoltaic power generation projectOpen announcement of candidates for winning bids in general contracting of EPC projects.
The project is located in Hutubi County, Changji Prefecture, with a total scale of 1650MW (AC side)/1982.76MWp (DC side), and is divided into six sections to carry out bidding. Among them, the bidding bid of the first section of the flow bid;
The bidding quote for the second section of the fifth section of the bid is 0.603~0.658 yuan/W; the weighted average price of the first candidate is 0.618 yuan/W. The candidates for winning bids in each section are as follows:
Table: Candidate for the PC winning bid for the Hutubi 1.65GW photovoltaic project in Hutubi, Xinjiang

According to the tender announcement:
Construction period: From the date of signing of the contract to November 30, 2026.
Tender scope: The 1.65 million kilowatt market-based grid-connected photovoltaic power generation project of Hutubi, Xinjiang Oilfield, photovoltaic power generation project, mainly including photovoltaic modules, supporting brackets, support foundations, string inverters, step-up box transformers, inverter-to-step-up box transformer power lines, and photovoltaic station supporting civil engineering, roads, communications, video surveillance, etc.
Main construction contents: photovoltaic modules, string inverters, boost box transformers, 35 kV convergence lines and supporting grounding, power cables, communications, roads, structures and other projects.
The winning bid candidate is announced as follows:
