On May 31, the first batch of 350 megawatt photovoltaic power generation project in Xiaozhai Town, undertaken by China Energy Construction Construction Group, was connected to the grid to generate electricity.

The project is located in Ludian County, Zhaotong City, Yunnan Province. It is distributed between Zhaoqiao Line (G352) and Duxiang Expressway (G7611) and on both sides. It covers an area of 13 kilometers north and south, a width of 10 kilometers east and west, and an altitude of 1500-2250 meters.
After the project is completed, the annual power generation will reach 5.152 billion kilowatt-hours, and the emissions of 421,300 tons of carbon dioxide can be reduced every year. It can optimize the power structure of Zhaotong City, increase the proportion of renewable energy, and help the region achieve the "dual carbon" goal, and combine ecological protection, energy conservation and emission reduction and social and economic benefits.